Unceasing interest in Lower Silesia increases the demand for well-prepared investment sites.
Responding to these expectations, Euro-Park Ząbkowice Ltd. offers an investment site in Ząbkowice Śląskie.
The location of the site, directly adjacent to the S8 expressway, will provide excellent connections to Wrocław and EURO-PARK Kobierzyce, as well as to central points in Poland. EURO-PARK Ząbkowice is located 60 km from Wrocław, in the northern part of Ząbkowice Śląskie, on national road no. 8, and covers an area of approx. 123 ha. Investment plots of various sizes (depending on the needs of the investment) will be equipped with all utilities and social facilities for transit.
The Local Spatial Development Plan allows manufacturing activities within Euro-Park Ząbkowice. On the investment area it is possible to construct production buildings, depots and warehouses as well as service/commercial development. The MPZP permits the erection of technical infrastructure and photovoltaic installations. Conditions for the installation of photovoltaic systems on the EPZ plot and for wind installations in nearby localities have also been specified.
The adjacent image shows the first visualizations of the subdivision of the EURO-PARK Ząbkowice site. We present the general concept together with the layout of internal roads and networks. The final subdivision and appearance of the site will depend on the needs of future investors.
The EPZ site is located on national road no. 8. A section of the S8 expressway, which will connect the site to the A4 motorway, will be built directly adjacent to the plot. Completion of the S8 road is planned for 2027. A well-developed public transport network ensures connections between the EPZ area, the city center and nearby towns.
There is a 220 kV high-voltage line at the EURO-PARK site — in the future a 440 kV line will run here. The main power supply for the plot is the Ząbkowice 220/110/120 kV switching station (GPZ), which is located approx. 3.5 km from the investment area.
A pressure-reduction and metering station is located on the opposite side of national road DK8 (ZZU Zwrócona station). A high-pressure gas pipeline with a pressure of 6.3 MPa is operated by Gaz-System – the gas transmission operator. The high-pressure pipeline is connected to a medium-pressure distribution pipeline at 1.6 MPa. To ensure gas supply for the investment, the gas pressure-reduction and metering station will be expanded or newly built.
EURO-PARK Ząbkowice will be connected to the water supply network, sanitary sewerage and the domestic wastewater discharge network along its southeastern section. PWiK Delfin Ltd. — the water company operating in Ząbkowice Śląskie — plans to modernize and expand the existing wastewater treatment plant to accept a larger wastewater flow. The current treatment capacity is approx. 2,500 m3/day and it is located about 5 km from the plot.
Public transport provides connections between the EPZ area and the city center as well as surrounding towns.
The EPZ site is located 4 km from the local PKP railway station. The station provides daily connections to Legnica, Kłodzko and Kudowa-Zdrój and all intermediate towns, as well as direct services to Kraków, Jelenia Góra and Wałbrzych. At the railway station there is a Service Infrastructure Facility (siding) used for transshipment. The usable area is 254 m², and the loading frontage at the yard is 128 m.