The investment, carried out jointly with the Municipality of Ząbkowice Śląskie, is entering the next stages. Finishing works are already underway on parts of the road network, while structural works continue at the roundabout and on the municipal road near DK8.

County road and municipal road towards Jaworek

Work completed to date:

  • paving works – curbs and paving stones,
  • base course and binder layer of asphalt concrete,
  • installation of lighting poles,
  • base for pedestrian and cycle paths,
  • ditch reinforcement.

Currently cleaning works, topsoiling and finishing of slopes and ditches are being carried out. Remaining work includes the wearing course of asphalt mix on the main carriageway and on the pedestrian-cycle routes, as well as implementation of the final traffic arrangement.

Roundabout and municipal road near DK8

As part of this scope of the project, the following have been completed:

  • improved subgrade layer,
  • principal base layer,
  • culverts under the road,
  • network of technological conduits.

Preparations are currently underway to begin paving works.

The carried-out investment is an important element in preparing the transport infrastructure that will serve the EURO-PARK Ząbkowice investment areas.

Below we present the latest photographic documentation from the construction site.

Photo source: SPEC-BRUK.